01

Production challenge

Handle multiple cardboard-box and product sizes on one production line with automatic changeover while meeting defined operating constraints.

02

Engineered solution

Automated gripper and conveyor adjustments enable transitions between product and box variants, with integrated stacking of packaged products onto pallets.

03

Customer value

Cycle time reduced from 35 to 28 seconds, automated changeovers and a production-line staffing reduction of three operators.

DETAILED CASE

How the equipment was engineered.

Production context, equipment design, scope of delivery and verified customer value.

01 / Customer challenge

The customer needed one production line capable of handling multiple cardboard-box and product sizes, with products varying in height and width.

The line therefore had to change automatically between variants while meeting defined operating constraints, including the maximum product weight.

02 / Engineered solution

DIS Systems developed an automated packing line with automatic adjustment of the gripper and conveyor systems so the equipment could transition between different cardboard-box and product dimensions.

The line also integrated stacking of packaged products onto pallets.

SCOPE OF DELIVERY

01

Concept generation

02

Requirement and test specification

03

Engineering including FEA

04

Risk assessment and CE documentation

05

Production

06

Factory Acceptance Test

07

Installation at customer sites in Germany, UK and United States

08

Site Acceptance Test

03 / Customer value

  • Accommodates a wide range of cardboard-box and product sizes
  • Automatic gripper changeover between variants
  • Cycle time reduced from 35 to 28 seconds
  • Integrated stacking of packaged products onto pallets
  • Reduced the production-line staffing requirement by three operators
CAPABILITIES USED

Concept generation, Requirement specification, Test specification, Mechanical engineering, FEA, Structural verification, Automated handling, Gripper adjustment, Conveyor adjustment, Automatic changeover, Packaging equipment, Pallet stacking, Risk assessment, CE documentation, Production, FAT, Installation, SAT