Universal Pitch Drive Installation Device

1 universal device
For left and right installation positions
Proven in production
Repeat orders following the first year of operation
Modular attachments
Supports different pitch drive variants
AT A GLANCE

The case in 30 seconds.

01

Production challenge

Replace separate left and right pitch-drive installation tools with one more reliable device that could support multiple product variants.

02

Engineered solution

A universal installation device with electric actuators, wireless control, modular attachments and dedicated transport and production stands.

03

Customer value

One device for both installation positions, improved production reliability, modular variant handling and repeat orders after proven operation.

← All projectsNext project →
blade-deflection-testing-equipment
DETAILED CASE

How the equipment was engineered.

Production context, equipment design, scope of delivery and verified customer value.

01 / Customer challenge

Replace separate left and right installation tools with one more reliable device for pitch-drive installation during hub production.

The new solution needed to simplify handling, support different pitch-drive variants and improve the installation process.

02 / Engineered solution

DIS Systems developed one universal installation device for both left and right pitch-drive positions.

Electric actuators provide controlled movement through a wireless handheld remote, while modular attachments support different variants. Dedicated production and transport stands support movement between installations.

SCOPE OF DELIVERY

01

Requirements and test specifications

02

Concept development with customer

03

Mechanical and electrical engineering

04

Risk assessment and CE marking

05

Manufacture and assembly

06

Factory Acceptance Test

07

Installation and Site Acceptance Test

03 / Customer value

  • One universal device for both installation positions
  • Improved reliability in production
  • Faster cycle time than originally expected
  • Modular attachments supporting different product variants
  • Proven performance followed by additional orders
CAPABILITIES USED

Requirements and test specifications, Concept development, Mechanical engineering, Electrical engineering, Electric actuator integration, Wireless control, Modular tooling, Risk assessment and CE marking, Manufacture and assembly, FAT, Installation and SAT